Chap I1Many Gulf countries find their power grids inadequate to meet the growing demand. In 2001, six states—Bahrain, Kuwait, Oman, Qatar, Saudi Arabia and the United Arab Emirates—founded the Gulf Cooperation Council Interconnection Authority (GCCIA) to address their collective electricity needs. The GCCIA promotes reliable, competitive and sustainable electrical transmission services for its member states. To do this, it established a set of challenging objectives, including goals to:                                      

• link the electrical power networks in member states;                                                

• reduce the electrical generation reserve;

• improve economic efficiency of the power systems;

• exchange electrical power.

The first major effort to meet these objectives was the creation of the GCCIA Project, a regionally integrated electricity market where member states can exchange power as needed in an economical and environmentally sound way. It links the electrical power networks of all member states. On completion, no country will need to be energy self-sufficient because each will be able to draw power from the others to handle a sudden change in load balance.The GCCIA Project consists of three phases:

• Phase I, energized in July 2009, connecting the north grid states to each other: Kuwait, Saudi Arabia, Bahrain and Qatar;

• Phase II, scheduled to be energized in 2010, to link the south grid nations of the United Arab Emirates and Oman to each other;

• Phase III, planned to be energized in 2011, to tie the north grid and south grid together.

AREVA T&D provided key components of Phase I, including the first Middle East installation of HVDC backto- back stations for power sharing.

 
 
 
The high rate of business development and improvement in the Gulf region
Innovative solution
Back-to-back HVDC for system control
Minimum spinning reserve = maximum savings
Future opportunities
 

Search

 

Websites Access

Links

Contact

wcc

Discover AREVA T&D

play